Document Control

Version Date Author Changes
1.0 2025-10-31 Project Management Office Initial version

Table of Contents

Executive Summary

Purpose

This Quality Management Plan establishes the quality standards, processes, and procedures for the KODA Multi-Tenant Beauty & Wellness Platform project. It ensures that all deliverables meet defined quality criteria and that the final product is reliable, secure, performant, and user-friendly.

Scope

This plan covers quality management for all 7 KODA applications:

  1. KODA Backend (API) - Laravel 12, PHP 8.2+
  2. KODA Mobile App - Flutter (iOS/Android)
  3. KODA Team App - Flutter (iOS/Android)
  4. KODA Website - ReactJS
  5. KODA CORE Admin - ReactJS
  6. KODA AI Engine - Laravel (AI/ML)
  7. KODA WebSocket Service - EMQX

Quality Objectives

Objective Target Measurement
Code Quality > 80% coverage (Backend/API) Automated code coverage tools
Defect Density < 5 defects per 1000 LOC Defect tracking system
API Response Time < 200ms (p95) Performance monitoring
Page Load Time < 2 seconds Lighthouse audits
Uptime 99.9% Server monitoring
Security Vulnerabilities 0 critical, < 5 high Security scanning tools
User Acceptance > 90% approval UAT feedback
Test Coverage 100% critical paths Test management system

Quality Investment

  • Total QA Hours: 488 hours
  • QA Team: 1 QA Tester (dedicated)
  • Security Testing: 66 hours (dedicated)
  • Performance Testing: 16 hours
  • Phase Distribution:
    • Phase 1: 236 hours
    • Phase 2: 82 hours
    • Phase 3: 170 hours

Quality Management Approach

Quality Philosophy

The KODA project adopts a "Quality by Design" approach:

  1. Prevention over Detection - Build quality into the process from the start
  2. Continuous Testing - Test early, test often, test continuously
  3. Risk-Based Testing - Prioritize testing based on business impact and technical risk
  4. Automation First - Automate repetitive tests to improve efficiency and consistency
  5. Multi-Layered Defense - Multiple testing layers (unit, integration, system, UAT, security)

Quality Methodology

Agile-Hybrid Quality Approach:

  • Sprint-Level Quality: Testing integrated into 2-week sprints
  • Phase-Level Quality: Major testing milestones at phase boundaries
  • Continuous Quality: Automated tests run on every commit
  • Progressive Quality: Quality gates at key milestones prevent defects from propagating

Quality Standards & Metrics

1. Code Quality Standards

Backend (Laravel)

Standards:
  - PSR-12 coding standard
  - Laravel best practices
  - SOLID principles
  - DRY (Don't Repeat Yourself)
  
Metrics:
  - Code coverage: > 80%
  - Cyclomatic complexity: < 10 per method
  - Class size: < 500 lines
  - Method size: < 50 lines
  - Code duplication: < 5%
  
Tools:
  - PHPStan (static analysis)
  - PHP_CodeSniffer
  - PHPUnit (testing)
  - PHPMD (mess detector)

Frontend (React)

Standards:
  - ESLint (Airbnb style guide)
  - TypeScript strict mode
  - Component-driven development
  - Accessibility (WCAG 2.1 AA)
  
Metrics:
  - Code coverage: > 70%
  - Bundle size: < 500KB (gzipped)
  - Lighthouse score: > 90 (Performance, SEO, Accessibility)
  - Type coverage: 100%
  
Tools:
  - ESLint
  - Prettier
  - Jest (testing)
  - React Testing Library
  - TypeScript compiler

Mobile (Flutter)

Standards:
  - Dart style guide
  - Flutter best practices
  - Clean architecture
  - Material Design / Cupertino guidelines
  
Metrics:
  - Code coverage: > 70%
  - Widget test coverage: 100% critical flows
  - App size: < 50MB
  - Startup time: < 2 seconds
  
Tools:
  - Dart analyzer
  - Flutter test
  - Integration test suite

2. Performance Standards

Application Metric Target Measurement Method
Backend API Response time (p95) < 200ms APM tools (New Relic/DataDog)
Response time (p99) < 500ms APM tools
Throughput > 1000 req/min Load testing
Error rate < 0.1% Monitoring logs
Website First Contentful Paint < 1.5s Lighthouse
Largest Contentful Paint < 2.5s Lighthouse
Time to Interactive < 3.0s Lighthouse
Cumulative Layout Shift < 0.1 Lighthouse
Mobile Apps App startup time < 2s Firebase Performance
Screen transition < 300ms Manual testing
API call latency < 1s Network inspector
Database Query time (p95) < 50ms Slow query log
Connection pool < 80% utilization DB monitoring

3. Security Standards

Category Standard Compliance
Authentication Multi-factor (OTP) OWASP ASVS Level 2
Authorization Role-based access control (RBAC) OWASP ASVS Level 2
Data Encryption TLS 1.3, AES-256 PCI DSS compliant
Password Storage bcrypt (cost factor 12) OWASP guidelines
Session Management Secure tokens, HttpOnly cookies OWASP guidelines
Input Validation Whitelist validation OWASP Top 10
SQL Injection Parameterized queries only OWASP Top 10
XSS Prevention Content Security Policy OWASP Top 10
CSRF Protection Token-based OWASP Top 10

4. Accessibility Standards

Standard Level Scope
WCAG 2.1 AA All web applications
Color Contrast 4.5:1 (normal text) All UI elements
Keyboard Navigation 100% navigable All interactive elements
Screen Reader Compatible (NVDA, JAWS, VoiceOver) All content
Mobile Accessibility TalkBack, VoiceOver support Mobile apps

Testing Strategy

Testing Pyramid

                    /\
                   /  \
                  / E2E\          ← 10% (Manual + Automated)
                 /______\
                /        \
               /Integration\      ← 30% (Automated)
              /____________\
             /              \
            /  Unit Tests    \    ← 60% (Automated)
           /__________________\

1. Unit Testing

Objective: Test individual components/functions in isolation

Coverage:

  • Backend: > 80% line coverage
  • Frontend: > 70% line coverage
  • Mobile: > 70% line coverage

Tools:

  • Backend: PHPUnit
  • React: Jest + React Testing Library
  • Flutter: Flutter Test

Responsibility: Developers (TDD approach)

Frequency: On every commit (CI/CD)

Examples:

  • User authentication logic
  • Payment calculation functions
  • Points calculation engine
  • Input validation functions
  • Business rule enforcement

2. Integration Testing

Objective: Test interactions between components/modules

Coverage:

  • All API endpoints: 100%
  • Critical integration points: 100%
  • Third-party integrations: 100%

Tools:

  • Backend: PHPUnit (Feature tests)
  • API: Postman/Newman
  • Frontend: Jest + Mock Service Worker

Responsibility: Developers + QA Tester

Frequency: Daily (automated)

Examples:

  • API authentication flow
  • Payment gateway integration
  • SMS gateway integration
  • Database transactions
  • WebSocket pub/sub

3. System Testing

Objective: Test complete end-to-end user flows

Coverage:

  • All user stories: 100%
  • All critical paths: 100%
  • All screens/pages: 100%

Tools:

  • Web: Selenium/Cypress
  • Mobile: Appium
  • API: Postman Collections

Responsibility: QA Tester

Frequency: Weekly + Before each milestone

Examples:

  • Complete booking flow (customer app)
  • Golden Opportunity booking + payment
  • Customer registration + verification
  • Staff check-in flow
  • POS transaction processing

4. User Acceptance Testing (UAT)

Objective: Validate business requirements with actual users

Coverage:

  • All Phase 1 features: 100%
  • All Phase 2 features: 100%
  • All Phase 3 features: 100%

Participants:

  • 5-10 real customers (for Mobile App)
  • 5-10 staff members (for Team App)
  • 3-5 admin users (for KODA CORE)

Responsibility: Product Owner + QA Tester

Frequency: End of each phase

Success Criteria:

  • > 90% user approval rating
  • < 10 major issues identified
  • All critical issues resolved before launch

5. Security Testing

Objective: Identify and remediate security vulnerabilities

Total Hours: 66 hours across 3 phases

Coverage:

  • OWASP Top 10: 100%
  • Authentication/Authorization: 100%
  • Multi-tenant isolation: 100%
  • Data protection: 100%

5.1 Static Application Security Testing (SAST)

Tools:

  • Backend: PHPStan, Psalm
  • Frontend: ESLint security plugins, Snyk
  • Mobile: Dart analyzer, Flutter analyze

Frequency: On every commit (automated)

Responsibility: Developers + DevOps

5.2 Dynamic Application Security Testing (DAST)

Tools:

  • OWASP ZAP
  • Burp Suite
  • SQLMap (SQL injection)
  • Nessus/OpenVAS

Frequency: Weekly + Before each milestone

Responsibility: QA Tester + External Security Consultant (optional)

Tests:

  • Penetration testing
  • Vulnerability scanning
  • Brute-force attack simulation
  • Session hijacking attempts
  • Multi-tenant data isolation verification

5.3 Security Test Schedule

Phase Hours Focus Areas
Phase 1 30 Authentication, Authorization, Multi-tenant isolation, Payment security
Phase 2 16 Loyalty system, Passport QR codes, Promo codes, Partner data isolation
Phase 3 20 HR data protection, Reports access control, Final penetration test, Compliance validation

6. Performance & Load Testing

Objective: Ensure system performance under load

Total Hours: 16 hours

Tools:

  • Apache Bench (ab)
  • Artillery
  • K6
  • JMeter
  • Locust

Test Scenarios:

Scenario Target Duration
Baseline Normal load (100 concurrent users) 10 minutes
Load Test 1,000 concurrent users 30 minutes
Stress Test Increase until breaking point Until failure
Spike Test Sudden traffic surge (0 → 1000 users in 1 min) 15 minutes
Soak Test Sustained load (500 users) 2 hours

Metrics Monitored:

  • Response time (p50, p95, p99)
  • Error rate
  • Throughput (requests per second)
  • CPU utilization
  • Memory utilization
  • Database connections
  • Cache hit rate

Performance Baseline:

  • API response: < 200ms (p95)
  • Database queries: < 50ms (p95)
  • Page load: < 2 seconds
  • App startup: < 2 seconds

7. Compatibility Testing

Web Compatibility

Browsers:

  • Chrome (latest)
  • Firefox (latest)
  • Safari (latest)
  • Edge (latest)

Devices:

  • Desktop: 1920x1080, 1366x768
  • Tablet: iPad, Android tablet
  • Mobile: iPhone, Android phone (various sizes)

Mobile Compatibility

Android:

  • Versions: 11, 12, 13, 14
  • Devices: Samsung (Galaxy S21-S23), Google Pixel (6-8), Xiaomi, Huawei

iOS:

  • Versions: 15, 16, 17
  • Devices: iPhone 12, 13, 14, 15 (including SE and Pro Max)

8. Accessibility Testing

Objective: Ensure WCAG 2.1 AA compliance

Tools:

  • WAVE (Web Accessibility Evaluation Tool)
  • axe DevTools
  • NVDA/JAWS screen readers (desktop)
  • VoiceOver (iOS)
  • TalkBack (Android)

Tests:

  • Keyboard navigation (100% navigable)
  • Screen reader compatibility
  • Color contrast ratios (> 4.5:1)
  • Alt text for all images
  • ARIA attributes
  • Focus indicators
  • Form labels

Responsibility: QA Tester + UI/UX Designer

Frequency: Weekly + Before each milestone

Quality Gates & Milestones

Quality Gates are mandatory checkpoints that deliverables must pass before proceeding to the next phase.

Quality Gate Template

Each quality gate includes:

  1. Entry Criteria - Conditions required to start the gate review
  2. Exit Criteria - Conditions required to pass the gate
  3. Deliverables - Required artifacts
  4. Sign-off - Required approvals
Note: All quality gates must be passed before proceeding to avoid defect propagation and ensure project quality.

Phase 1 Quality Gates

QG1.1: Backend API Foundation (Week 4)

Entry Criteria:

  • All authentication APIs implemented
  • Multi-tenant architecture complete
  • User management APIs complete
  • Unit tests written

Exit Criteria:

  • API unit test coverage > 80%
  • All API endpoints documented (Swagger/OpenAPI)
  • Postman collection created with 100+ test cases
  • Zero critical security vulnerabilities
  • Multi-tenant data isolation verified (CRITICAL)
  • Performance: API response < 200ms (p95)
  • Code review completed
  • Security review completed

Deliverables:

  • Backend codebase (authentication + multi-tenant)
  • API documentation
  • Postman test collection
  • Test coverage report
  • Security scan report

Sign-off: Backend Lead, QA Tester, DevOps Engineer

QG1.2: Website Launch (Week 8)

Entry Criteria:

  • All Phase 1 website pages implemented
  • Responsive design complete
  • SEO optimization complete

Exit Criteria:

  • All pages functional across browsers (Chrome, Firefox, Safari, Edge)
  • Mobile responsive design verified
  • Lighthouse score > 90 (Performance, SEO, Accessibility)
  • Page load time < 2 seconds
  • WCAG 2.1 AA compliance verified
  • No critical or high security vulnerabilities
  • Cross-browser testing completed
  • Content review completed

Deliverables:

  • Website codebase
  • Lighthouse audit reports
  • Accessibility audit report
  • Cross-browser test results

Sign-off: ReactJS Lead, QA Tester, Product Owner

QG1.3: Mobile App Core (Week 12)

Entry Criteria:

  • All Phase 1 mobile app screens implemented
  • Authentication flow complete
  • Booking flow complete
  • Golden Opportunities feature complete

Exit Criteria:

  • All critical user flows tested (registration, booking, payment)
  • iOS and Android compatibility verified (versions 15-17 iOS, 11-14 Android)
  • App startup time < 2 seconds
  • No critical crashes or freezes
  • Payment gateway integration tested (sandbox + production)
  • Push notifications working
  • Offline mode tested
  • App store submission requirements met (metadata, screenshots, privacy policy)
  • Security testing completed (OWASP Mobile Top 10)

Deliverables:

  • Mobile app builds (iOS .ipa, Android .apk)
  • Test results (functional, compatibility, performance)
  • App store assets (screenshots, descriptions)
  • Security audit report

Sign-off: Flutter Lead, QA Tester, Product Owner

QG1.4: Team App Core (Week 14)

Entry Criteria:

  • All Phase 1 Team App screens implemented
  • Staff authentication complete
  • Booking management complete
  • POS functionality complete

Exit Criteria:

  • All staff workflows tested (check-in, session management, POS)
  • iOS and Android compatibility verified
  • QR code scanner functional
  • POS cash drawer reconciliation tested
  • Role-based access control verified
  • No critical issues
  • Performance acceptable on mid-range devices

Deliverables:

  • Team app builds
  • Test results
  • User guide for staff

Sign-off: Flutter Lead, QA Tester, Operations Manager

QG1.5: KODA CORE Admin (Week 16)

Entry Criteria:

  • Customer management module complete
  • Reservations calendar complete
  • POS module complete
  • Basic dashboard complete

Exit Criteria:

  • All Phase 1 KODA CORE features functional
  • Customer profile with all tabs working
  • Reservations calendar (drag-drop) working
  • POS transaction processing tested
  • Multi-tenant admin isolation verified (CRITICAL)
  • Permissions system tested
  • Browser compatibility verified
  • Performance acceptable (large customer lists load < 3s)
  • Data export (Excel, PDF) working

Deliverables:

  • KODA CORE codebase
  • Admin user guide
  • Test results
  • Performance benchmark report

Sign-off: ReactJS Lead, QA Tester, Product Owner, IT Admin

QG1.6: Phase 1 Go-Live (Week 17)

Entry Criteria:

  • All Phase 1 quality gates passed
  • UAT completed
  • Production environment ready
  • Training completed

Exit Criteria:

  • All Phase 1 features accepted by stakeholders
  • UAT sign-off received (> 90% approval)
  • All critical and high defects resolved
  • Security audit passed (zero critical vulnerabilities)
  • Performance benchmarks met
  • Production smoke tests passed
  • Backup and disaster recovery tested
  • Monitoring and alerting active
  • Rollback plan documented and tested
  • Support team trained

Deliverables:

  • Production-ready applications (all 5: Backend, Mobile, Team, Website, CORE)
  • UAT sign-off document
  • Security audit report
  • Performance test report
  • Production readiness checklist
  • Training materials
  • Support documentation

Sign-off: Project Manager, Product Owner, QA Lead, DevOps Lead, Stakeholder Representative

Phase 2 Quality Gates

QG2.1: Loyalty System (Week 22)

Entry Criteria:

  • Points calculation engine implemented
  • Tier system implemented
  • Points redemption implemented

Exit Criteria:

  • Points calculation accuracy verified (100% accuracy)
  • Tier progression tested
  • Points redemption flow tested
  • Points expiry logic tested
  • Security: Points manipulation attempts blocked
  • Performance: Points calculation < 100ms

Deliverables:

  • Loyalty system test results
  • Points calculation verification report

Sign-off: Backend Lead, QA Tester, Product Owner

QG2.2: Passport Partner System (Week 24)

Entry Criteria:

  • Partner directory implemented
  • QR code generation/validation implemented
  • Benefit activation implemented

Exit Criteria:

  • Partner directory functional
  • QR code generation tested
  • QR code expiry (5 minutes) verified
  • Benefit activation flow tested
  • Security: QR code forgery/replay attacks blocked
  • Tier-based access control verified (Ambassador+ only)

Deliverables:

  • Passport system test results
  • Security test report (QR codes)

Sign-off: Backend Lead, Flutter Lead, QA Tester, Product Owner

QG2.3: Phase 2 Go-Live (Week 26)

Entry Criteria:

  • All Phase 2 quality gates passed
  • Phase 2 UAT completed

Exit Criteria:

  • All Phase 2 features accepted
  • UAT sign-off (> 90% approval)
  • All critical/high defects resolved
  • Security audit passed
  • Performance benchmarks met
  • Production deployment successful

Deliverables:

  • Updated applications
  • UAT sign-off
  • Security audit report
  • Deployment report

Sign-off: Project Manager, Product Owner, QA Lead

Phase 3 Quality Gates

QG3.1: HR Module (Week 30)

Entry Criteria:

  • Employee management implemented
  • Attendance tracking implemented
  • Leave management implemented
  • Payroll processing implemented

Exit Criteria:

  • All HR workflows tested
  • Payroll calculations verified (100% accuracy)
  • Security: Payroll data protection verified
  • Access control: HR data restricted to authorized users only

Deliverables:

  • HR module test results
  • Payroll calculation verification
  • Security audit

Sign-off: ReactJS Lead, QA Tester, HR Manager

QG3.2: Reports Module (Week 32)

Entry Criteria:

  • All 20+ reports implemented
  • Report export functionality implemented

Exit Criteria:

  • All reports tested for data accuracy
  • Report filters working correctly
  • Export to Excel/PDF functional
  • Report generation performance < 5 seconds
  • Security: Report data filtered by user permissions

Deliverables:

  • Reports test results
  • Data accuracy verification
  • Performance test results

Sign-off: ReactJS Lead, Backend Lead, QA Tester, Finance Manager

QG3.3: KODA AI Engine (Week 34)

Entry Criteria:

  • AI reports generation implemented
  • WhatsApp integration implemented
  • Instagram integration implemented

Exit Criteria:

  • AI reports accuracy verified
  • WhatsApp bot response accuracy > 80%
  • Instagram bot response accuracy > 80%
  • AI knowledge base tested
  • API rate limiting tested
  • Security: AI API authentication verified

Deliverables:

  • AI engine test results
  • Bot accuracy reports
  • API test results

Sign-off: Backend Lead (AI), QA Tester, Marketing Manager

QG3.4: Complete System Integration (Week 35)

Entry Criteria:

  • All 7 applications deployed
  • All integrations complete

Exit Criteria:

  • End-to-end user journey tested (customer discovery → booking → session → loyalty)
  • Data syncs across all applications verified
  • WebSocket real-time updates working
  • Multi-tenant isolation verified across all apps (CRITICAL)
  • Performance: 1000+ concurrent users supported
  • Load test passed (30-minute sustained load)
  • Accessibility: WCAG 2.1 AA compliance verified

Deliverables:

  • E2E test results
  • Performance test report
  • Load test report
  • Accessibility audit report

Sign-off: All Tech Leads, QA Lead, DevOps Lead

QG3.5: Production Readiness & Final Launch (Week 36)

Entry Criteria:

  • All Phase 3 quality gates passed
  • Final UAT completed
  • Production environment fully configured

Exit Criteria:

  • All features accepted by stakeholders
  • Final UAT sign-off (> 90% approval)
  • Zero critical defects, < 5 high defects
  • Final security audit passed (comprehensive)
  • Compliance validation complete (GDPR, PCI DSS if applicable)
  • Performance benchmarks met
  • Production smoke tests passed
  • Monitoring and alerting validated
  • Backup/restore tested
  • Disaster recovery plan validated
  • Rollback plan tested
  • Support team trained
  • Documentation complete

Deliverables:

  • Production-ready complete system (all 7 applications)
  • Final UAT sign-off
  • Final security audit report
  • Compliance certification (if applicable)
  • Final performance test report
  • Production readiness checklist (completed)
  • Complete documentation set
  • Training completion certificates

Sign-off: Project Manager, Product Owner, QA Lead, DevOps Lead, Security Lead, All Stakeholder Representatives

Previous: Risk Management Plan Next: Communications Plan

Document Approval

Role Name Signature Date
Project Manager
QA Lead
Backend Lead
Frontend Lead
Mobile Lead
DevOps Lead
Product Owner
END OF QUALITY MANAGEMENT PLAN